Dealer Signin Signin Signup

1 TP 11

Specification

According to the project and details,

  • Aypan DU profiles made of galvanized steel sheet according to TS EN 14195 must be fixed to the base and ceiling by using Aypan screws and plastic dowels at 60 cm intervals.
  • Aypan sound insulation tape should be affixed behind the Aypan DC profiles (made in accordance with TS EN 1495) to be attached to DU and side walls.
  •  The DC profiles should be dimensioned according to the wall height (cut if necessary).
  •  The DC profiles must be inserted between the DU profiles at 40 or 60 cm intervals.
  • If desired, rockwool plates of appropriate thickness and density should be placed between the DC profiles.
  •  Aypan should be cut and sized and fixed to the profiles with 25 mm drywall screws (maximum 30 cm spacing). Aygips joint filler plaster should be pre-filled into gaps more than 3mm. Screw heads should be covered with Aygips grouting plaster. Joint tape should be adhered to Aypan joints.
  • A partition wall should be formed by applying Aygips joint filler plaster on the joint tape.

The price of 1 m2 including all kinds of materials and losses, loading at the customer, horizontal and vertical transportation, unloading and contractor profit and general expenses.

 

en